Template Tasks

What Is a Template Task

A Template Task predefines work due when a template milestone takes effect; once the study is generated from the template, it becomes a study-side Clinical User Task (see Clinical Tasks).

For example, the Study Start milestone carries Confirm TMF Filing Plan (required, 14-day turnaround); Final Database Lock carries Prepare Database Lock Checklist (7 days).

Key Fields

Maintain under Admin Setup → Template Tasks:

FieldNotes
NameTask name (required, unique)
Milestone SetThe owning set (required)
MilestoneThe linked template milestone (required)
RequiredWhether required (default no); required tasks count toward milestone completeness
Expected Turnaround Time (Days)Expected completion time (0–200 days)
CategoryTask category (required), e.g. Essential Documents/ISF, Data Collection/Data Entry/Query Resolution
PriorityRequired: Low / Medium / High

Relationship to Runtime Tasks

A template task hangs on both a set and a milestone; when the study runs Plan Study and milestones are generated from the template, the system copies template tasks into study-side clinical tasks, inheriting category, priority, requiredness, and expected turnaround. Completed runtime tasks count toward the owning milestone's completeness (see Milestones).

Note

Template tasks define only "what to do"; assignment (Assigned To), dates, and resolution live on the study-side task. Changing a template does not change tasks already generated.

Required Permissions & Roles

TypePermissionControls
ObjectTemplate Task: Create, Read, EditPredefining task lists for milestones

Clinical Application Administrator manages template tasks; Document Contributor is read-only.